Documents · Variations
Confirmation of instruction
Written confirmation of an oral or site instruction: who gave it, when and where, the instruction as given and the work it covers, whether it is a variation, a request for a formal written instruction and a reservation of value and time, with a schedule of supporting records. Calculates any dissent date and flags late confirmations.
- When it is due
- As the contract sets. Puncheur works the date out from your contract and puts it in your calendar.
- If it is late or missed
- An oral instruction not confirmed in time may not be paid as a variation.
Drafted from your contract, with its dates checked
£50 + VAT on its own, paid before it is drafted, or included on Autonomous Commercial Management. You check it and serve it.
Draft this documentRead the guide
- How are variations valued under JCT?Under JCT a variation is valued at the contract rates for similar work, with a fair allowance for changed conditions, or at fair rates if it is not similar.Guide · Variations
- How to confirm a verbal instructionA verbal instruction under JCT has no immediate effect. Confirm it in writing within 7 days. Under NEC4 an instruction must be in a form that can be recorded.Guide · Variations
A guide, not legal advice. The contract’s own terms govern; where it has none that comply with the Construction Act, the Scheme for Construction Contracts applies.